Archivio Categoria: Industrial Plants – Oil&Gas

Structural design of tank Seawater intake “SEA WATER INTAKE” in r.c. with the use of Wellpoint, site in the town of Priolo (SR) On behalf of the associations temporary business Co.Ge.Ital (Priolo-SR) – Italy -So.Ge.A (Gela-CL) – Italy

Activity:                        Structural Design – Concrete Structures – Shopdrawing Software:                     BIM – Midas e 3d Model TeklaStructures Environment GC/Owner:                   ISAB Energy S.p.a. – Prilo (SR) – Italy Commissioned:            Consorzio Snamprogetti – Foster Wheleer – Energy Location:                       Priolo (SR) – Italy Software period:         2008 Amount of Work:        2.100.000 € Difficulty:                      ****             Category:             Industrial Plants – Oil&Gas

Structural design and architectural substation Electrical referred to as “LC01- LC02-LC03-LC04-LC05 “in c.a, site in the town of Priolo (SR) for account of temporary associations business Co.Ge.Ital (Priolo- SR) – Italy – So.Ge.A (Gela-CL) -Italy e Tecnoservice (Camnago-MI) – Italy.

Activity:                        Structural Design – Concrete Structures – Shopdrawing Software:                     BIM – Midas e 3d Model TeklaStructures Environment GC/Owner:                   ISAB Energy S.p.a. – Prilo (SR) – Italy Commissioned:            Consorzio Snamprogetti – Foster Wheleer – Energy Location:                       Priolo (SR) – Italy Software period:         2008 Amount of Work:        3.400.000 € Difficulty:                      ***     Category:                      Industrial Plants – Oil&Gas

Realization of surveying, thematic and typological analysis of the territory of competence, with representation graphics needed for the study Feasibility dell’ETILENODOTTO AGIP PRIOLO-ERG PETROLIICAM PRIOLO – Italy.

Activity:                        Topography Software:                     Topography GC/Owner:                   ERG PETROLIICAM PRIOLO – Italy Commissioned:            4D S.r.l – Geom. F.Meli Location:                       ETILENODOTTO AGIP PRIOLO-ERG PETROLIICAM PRIOLO – Italy Software period:         2009 Amount of Work:        55.000 € Difficulty:                      * Category:                      Industrial Plants – Oil&Gas

Directing the work of foundations in the AC for the “Empty” plant Visbreaking (I and II step) plant “ERG OILS” site in the town of Priolo (SR) to account of the enterprise Co.Ge.Ital (SR-Priolo) – Italy.

Activity:                        Structural Design – Concrete Structures – Shopdrawing Software:                     BIM – Midas e 3d Model TeklaStructures Environment GC/Owner:                   ERG PETROLIICAM PRIOLO – Italy Commissioned:            Co.Ge.Ital (SR-Priolo) Location:                       Priolo (SR) – Italy Software period:         2008 Amount of Work:        270.000 € Difficulty:                      **          Category:                      Industrial Plants – Oil&Gas

Project of dismantling and removing rig and related accessory parts of the platform A. Vega Modules: D1-D2-D3-D5 Camp Vega – Vega A Platform

Activity:                        Structural Design – Steel Structures – Design Connections – Steel details Software:                     BIM – Midas e 3d Model TeklaStructures Environment GC/Owner:                   Camp Vega – Vega A Platform Commissioned:            IBR Costruzioni S.r.l. Ing. Iannò – Melilli (SR) – Italy Location:                       Camp Vega – Vega A Platform Software period:         2010 Amount of Work:        230.000 € […]

“Project for the construction of a manufactured in steel to use “Control Room” for an incineration plant approved by Ordinance Deputy Commissioner emergency Sicily Region n. ° 83/05 in the r.c. to achieve In contrada Punta Cugno in Augusta (SR) – Italy

Activity:                        Structural Design – Steel Structures – Design Connections – Steel details Software:                     BIM – Midas e 3d Model TeklaStructures Environment GC/Owner:                   GE.S.P.I. srl -Augusta (SR) – Italy Commissioned:            GE.S.P.I. srl -Augusta (SR) – Italy Location:                       Augusta (SR) – Italy Software period:         2009 Amount of Work:        400.000 € Difficulty:                      ***     Category:                      Industrial Plants – […]

The Design for Construction of Metal framework on the platform for attemperation located on the pipe rack PR \ April \ B between the alignments PR \ PR-1 \ 2 into the 1800’s, situated at the plant ERG RAFFINERIE MEDITERRANEAN spa in Priolo (SR) – Italy

Activity:                        Structural Design – Steel Structures – Design Connections – Steel details Software:                     BIM – Midas e 3d Model TeklaStructures Environment GC/Owner:                   ERG RAFFINERIE MEDITERRANEAN spa Commissioned:            IBR Costruzioni S.r.l. Ing. Iannò – Melilli (SR) – Italy Location:                       ERG RAFFINERIE MEDITERRANEAN spa in Priolo (SR) – Italy Software period:         2010 Amount of Work:        230.000 […]

Design for the construction of a foundation adapted to contain the installation of a plant incinerator approved by Order of Deputy Commissioner No emergency Region Sicily. ° 83/05 in the AC to achieve in a Contrada Punta Cugno site in Augusta (SR) – Italy

Activity:                        Structural Design – Steel Structures – Design Connections – Steel details Software:                     BIM – Midas e 3d Model TeklaStructures Environment GC/Owner:                   GE.S.P.I. srl -Augusta (SR) – Italy Commissioned:            GE.S.P.I. srl -Augusta (SR) – Italy Location:                       Augusta (SR) – Italy Software period:         2010 Amount of Work:        3.000.000 € Difficulty:                      ****              Category:                      Industrial Plants – […]

“Design for the installation of a incineration plant approved Order by Commissioner delegate to the emergency Region No Sicily. ° 83/05 in the AC to achieve in Contrada Punta Cugno site in Augusta (SR) – Italy.

Activity:                        Structural Design – Steel Structures – Design Connections – Steel details Software:                     BIM – Midas e 3d Model TeklaStructures Environment GC/Owner:                   GE.S.P.I. srl -Augusta (SR) – Italy Commissioned:            GE.S.P.I. srl -Augusta (SR) – Italy Location:                       Augusta (SR) – Italy Software period:         2010 Amount of Work:        14.000.000 € Difficulty:                      ****              Category:                      Industrial Plants – […]

“Structural design of all steel structures necessary for the installation of a multipurpose platform integrated waste for special dangerous and non- dangerous to achieve in Contrada  Punta Cugno site in Augusta (SR) – Italy. Project Architect: Aedilia Progetti srl. – Arch-Francesco Pappalardo Systems design: INCICO S.p.a. – Milan – Italy Project foundations INCICO S.p.a.– Ferrara – Italy

Activity:                        Structural Design – Steel Structures – Design Connections – Steel details Software:                     BIM – Midas e 3d Model TeklaStructures Environment GC/Owner:                   OIKOTHEN s.c.ar.l. Commissioned:            OIKOTHEN s.c.ar.l. Location:                       Contrada  Punta Cugno site in Augusta (SR) Software period:         2010 Amount of Work:        70.000.000 € Difficulty:                      ***     Category:                      Industrial Plants – Oil&Gas