Activity:                        Structural Design – Steel Structures – Design Connections

Software:                     BIM – TeklaStructures for SmartPlants3d – 3d model in TeklaStructures Environment

GC/Owner:                   ENI tecnomare – Milano (Italy)

Commissioned:            Progra srl – Ravenna – Italy (Subcontractor ENI)

Location:                       Gela (CL) – Italy

Software period:         2016

Amount of Work:         260.000.000 €

Difficulty:                      ****             

Category:                      Industrial Plants – Oil&Gas